The Oncor 765 kV line from Glen Rose to Forsan is one of the biggest power line jobs this part of Texas has seen. Eastland County was in its study area, and the approved route runs between two endpoints that sit on either side of Eastland along the I-20 direction.
If you run a line crew, or you are the coordinator who has to find twenty sites by the end of the month, this page is for you. It covers what was approved, what the public record does and does not show about the route, how these builds move, and what a base at Exit 343 costs against per diem. The question that decides whether one base works for a whole segment is answered in the checklist below.
Quick answer: The Oncor 765 kV Dinosaur to Longshore line was approved by the Public Utility Commission of Texas on August 28, 2026 on Route 559, about 243 miles from a new switch north of Glen Rose to the Longshore switch near Forsan. Eastland County was in the study area; public reports do not list the counties Route 559 crosses. Oncor lists completion in 2029, so 2027 and 2028 are the likely field years. Monthly RV sites at Exit 343 in Eastland are $500 to $650 plus metered electric.
The Dinosaur to Longshore line is a single-circuit 765 kilovolt transmission line on steel lattice towers, one of the first lines of that voltage approved in Texas, built to move power west from the Glen Rose area toward the Permian Basin. The facts below come from Oncor's project page and Dallas Express coverage of the approval.
| Item | Dinosaur to Longshore 765 kV |
|---|---|
| East end | Dinosaur Switch (new), about 3 miles north of Glen Rose, Somervell County |
| West end | Longshore Switch (existing), about 4.5 miles west of Forsan, Howard County |
| Approved route | Route 559, about 242.6 miles |
| Approval | PUCT, August 28, 2026, Docket 59315 |
| Estimated cost | About $2.24 billion including station work |
| Completion | 2029 on Oncor's project page; a 2028 target in news coverage |
| Structures | Self-supporting steel lattice towers |
The same commission vote approved a second line, Longshore to Drill Hole, running further west toward the Culberson and Reeves county line. Together the two lines total about 424 miles. Crews that finish one segment will have more work further west.
Here is what is on the record, and what is not. In March 2026 the Ranger City Council passed a resolution opposing the proposed Dinosaur to Longshore line through Eastland County, in line with the Eastland County Commissioners Court. The minutes note the routes then under study were not near Ranger itself.
Oncor's project page lists Eastland County Today among the papers that ran its public notice in May 2025. Further west, The Albany News reported that the approved route does not cross Shackelford County, and Dallas Express noted that the case notices named 30 counties but the selected route does not cross all of them.
None of the public sources we found lists the counties Route 559 of the Oncor 765 kV line crosses, so we will not claim it crosses Eastland County. That map lives in PUCT Docket 59315, and we would rather send you there than guess.
What we can tell you is geography. Glen Rose, the east end, is south of I-20 below Fort Worth. Forsan, the west end, is just south of Big Spring on I-20. Eastland and Exit 343 sit between them along the interstate.
A crew working a middle segment of the line may be within daily driving range of Exit 343. Check your segment against the docket map before you plan the drive.
The Oncor 765 kV line is not a small job. The towers are taller and wider than the 345 kV structures most people see along I-20, and the work comes in waves. Neither Oncor nor the commission had published a field schedule as of October 2026, so treat the sequence below as how these builds typically run, not a dated plan.
Each wave brings its own trailers, and each wave moves along the line a few miles at a time. That is the housing problem in one sentence: the work moves, but nobody wants to move the rig every two weeks.
The Middle-of-the-Stretch Base Plan means a line crew parks every rig at one monthly base near the middle of its assigned segment and drives to the work, instead of moving the rigs each time the segment advances. It fits the Oncor 765 kV line better than most jobs because the work moves along one long line. Three steps:
The math behind it is simple. Every re-hitch costs a day of setup, a new deposit somewhere, and a crew split across two parks while somebody waits for a site. One base kills all three.
| Site | Monthly rate | Electric | Deposit | Terms |
|---|---|---|---|---|
| Back-in site | $500 | Metered, 17 cents per kWh | $200 refundable | Month to month |
| Pull-through site | $650 | Metered, 17 cents per kWh | $200 refundable | Month to month |
| Nightly, before a monthly start | From $40 a night | Included | None beyond booking | Book online |
Metered electric means you pay for the kilowatt hours your own pedestal records, not a flat estimate. The bill depends on the rig and the season. A crew on site twelve hours a day uses less than a family running two air conditioners in July.
Many line contractors pay lodging per diem at or near the federal rate. For fiscal 2027, starting October 1, 2026, the GSA standard lodging rate is $113 a night. Check your county in the GSA per diem lookup and your own contract.
Our per diem RV living guide for Texas runs a full ledger with fuel, electric and the cases where a hotel still wins.
If you have ever split a crew across three parks because nobody had sites together, you already know why calling early matters.
Three things were not public as of October 2026, and every crew lead should plan around them rather than wait for them.
None of that changes the base plan. It only changes the date you call. We will update this page when Oncor publishes a schedule.
The Oncor 765 kV line is not the only work pulling trades into this stretch of I-20 through 2028.
The full map, with every base and monthly rate we know, is in our Stargate and Abilene data center worker housing guide. Crews comparing Abilene options can also read our guide to crew housing in Abilene and our Elmdale RV Park versus Inez Spring comparison.
Every two weeks a crew re-hitches, it loses a day, a deposit and usually a few workers to a different park. Across a two-year build that adds up to weeks of lost setup time and a crew that never quite lives in one place.
Now picture month two on the Oncor 765 kV line. Every rig in the crew is level at one park at Exit 343. The convoy leaves together at 5:30. On Sunday somebody is fishing the Leon River, and the invoice for each site is the same number it was the first month.
Why it works for a line crew: one base covers a long reach of the segment, the rate is published, and it is month to month, so it moves when your work does. What the crew gets:
Rated 4.8 stars on 222 Google reviews as of October 2026. For a whole crew, call (254) 629-1197 with the rig count, lengths and start date, and ask which sites side by side are open.
The public sources we found do not say. Eastland County was in the study area for the Oncor 765 kV Dinosaur to Longshore line, and in March 2026 the Eastland County Commissioners Court and the City of Ranger opposed the proposed routes through the county. The state approved Route 559 on August 28, 2026, and news reports confirm only that it avoids Shackelford County. The route map in PUCT Docket 59315 shows the exact path.
Oncor had not published a construction start date or named contractors as of October 2026. Its project page lists completion in 2029, and a September 2026 news report put the target at 2028. Lines this size usually run clearing and foundations first, then tower erection and stringing, so expect the field years for crews to be 2027 and 2028.
Inez Spring Riverfront RV Park sits off I-20 at Exit 343 in Eastland, with full-hookup sites, 30 and 50 amp power, water and sewer at every site. Monthly sites are $500 for a back-in and $650 for a pull-through, plus metered electric at 17 cents per kWh, a $200 refundable deposit and month-to-month terms.
Yes, when enough sites are open for your dates. Ask for pull-through sites for fifth wheels and anything pulling a second trailer. Monthly sites are $500 for a back-in and $650 for a pull-through, plus metered electric at 17 cents per kWh, with a $200 refundable deposit and month-to-month terms. Call (254) 629-1197 with crew size, rig lengths and a start date.
The federal standard lodging rate for fiscal 2027 is $113 a night, about $3,390 a month, and many contractors pay at or near it. A $500 back-in site leaves about $2,890 before electric and fuel, and a $650 pull-through about $2,740. Your contract sets the real number, so run the math with your own per diem before you choose.
Transmission crews work a segment for weeks and then the segment moves. A rig parked at one base near the middle of a stretch avoids re-hitching every few weeks, keeps the crew in one place for the morning convoy, and keeps one monthly rate. Exit 343 sits on I-20 between the two ends of the Oncor 765 kV line, so check the docket map for how far your segment is from it.