Quick answer: Inez Spring Riverfront RV Park in Eastland rents monthly sites to pipeline crews at $500 for a back-in and $650 for a pull-through up to 100 feet, plus your own metered electric at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park sits one minute off I-20 at Exit 343, in a county the Hugh Brinson pipeline crossed.
Between pipeline jobs and need a place to park the camper by the month? Inez Spring keeps monthly sites at $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month, one minute off I-20 at Exit 343, about 50 minutes from Abilene. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
Pipeline work moves. The mainline gets tied in, the spread demobilizes, and the next job is three counties or three states away. If you need a place to park the camper while that happens, or a base for the station and lateral work that follows a big line, our crew RV sites near Abilene and Eastland page has the full crew details. This post is the short version for pipeline hands.
A pipeline worker RV park is an RV park that rents full hookup sites by the month, without a long lease, to crews who bring their own campers and move when the job moves. The things that matter are simple: month to month terms, long sites for a truck and trailer, a fair deposit, and a bill that shows site rent and electric on separate lines.
That is what we offer. We do not include electric in the rent and we do not guess at your bill. Each site has its own meter. You pay for what your rig uses, at 17 cents per kWh, and you see the reading.
The mainline is in service. Energy Transfer began commercial service in August 2026, according to BIC Magazine. The line runs about 442 miles across 18 Texas counties, from the Waha area to Maypearl south of the Metroplex. BIC names Eastland and Erath among the counties crossed. A 14-mile lateral in Abilene was finished in the second quarter of 2026.
That does not mean every crew is gone. The U.S. Energy Information Administration lists a second phase of Hugh Brinson, with added compression, for the first quarter of 2027. Compression and tie-in work tends to need smaller crews for longer. We cannot tell you who is hiring. We can tell you where to park while you find out.
Smaller jobs are on the state list close to Abilene. The Railroad Commission construction list of September 18, 2026 shows Energy Transfer's Bolt Shackelford Datacenter Interconnect, 7.5 miles of 24 inch pipe in Shackelford County with a start date of March 1, 2027, and a 2 mile, 24 inch Duroc Power Plant lateral in Taylor County that started August 3, 2026 (Texas RRC pipeline construction list). Both sit on the Abilene side of I-20, west of the park.
Texas is where most new gas pipe is going. The EIA reported in May 2026 that Texas projects make up more than 66 percent, or 29.7 Bcf per day, of the 44.9 Bcf per day of U.S. pipeline capacity planned for 2026 and 2027. Here are the large Texas projects the EIA and BIC named, with their published dates.
| Project | Route | Size | Published timing |
|---|---|---|---|
| Hugh Brinson (Energy Transfer) | Waha area to Maypearl, about 442 miles, incl. Eastland and Erath counties | 1.5 Bcf/d Phase I, up to 2.3 Bcf/d with Phase II | In service Aug 2026; Phase II Q1 2027 |
| Blackcomb Pipeline | Waha hub to Agua Dulce hub, 365 miles | 2.5 Bcf/d | Q3 2026 |
| Rio Bravo Pipeline | 138 miles to the Rio Grande LNG terminal | Up to 4.5 Bcf/d | Second half of 2026 target |
| Inez Spring monthly site | Exit 343 on I-20, Eastland | $500 back-in, $650 pull-through, plus metered electric at 17 cents per kWh | Month to month |
Sources: EIA Today in Energy, May 26, 2026 and BIC Magazine, August 2026, read October 10, 2026. Dates move. Check with your contractor before you haul.
Pipe is not the only line work near us. The Oncor 765 kV transmission line was approved in August 2026 and will run west from near Glen Rose toward Forsan. We wrote about it in RV sites for lineman crews on the Eastland County line.
Because I-20 goes both ways. From Exit 343, Abilene is about 50 minutes west and Fort Worth is about 1 hour 35 minutes east. Dallas is about 2 hours. If the next call is in the Permian, you are already pointed west. If it is in East Texas or the Metroplex, you are pointed east. A park in the middle saves you from hauling the camper twice.
We put real drive times to the big job sites near Abilene in the Eastland to Abilene commute table. Drive yours at 5 a.m. once before you sign up a crew for it.
We asked ourselves what a pipeline hand would check first, and wrote the honest answer next to each.
For fiscal 2027 the federal standard lodging rate is $113 a night, per the GSA per diem rates. Your company may pay a different number, so use your own. Thirty nights at $113 is $3,390. A monthly site here is $500 or $650 in rent, plus your own metered electric. The honest total is rent plus the meter, and the meter is yours to control.
Per diem tax rules depend on your situation. For tax questions, check with a tax professional. We wrote more about the money side in per diem RV living in Texas.
Call the office with four things: how many rigs, how long each one is, your start date, and roughly how long the job runs. We check which neighboring sites are open, hold them with the $200 refundable deposit per site, and text the site numbers so late arrivals can pull straight in. If the company pays, ask for one invoice for the whole crew.
A supervisor without an RV can stay in the barndominium, which sleeps 11. See rates on the booking page.
Not much, and that is the point. The Leon River runs through the park and there is a private kayak launch. Lake Leon is about 10 minutes away. Fuel, groceries and food are in Eastland, a couple of minutes from the gate. When the family drives out on a weekend, there is room to sit by the river.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric included on the meter.
At Inez Spring Riverfront RV Park a back-in site is $500 a month and a pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top. The deposit is $200 and refundable, and terms are month to month.
Energy Transfer started commercial service on Hugh Brinson in August 2026, according to BIC Magazine, with a 14-mile Abilene lateral finished in the second quarter of 2026. The EIA lists a second phase with added compression for the first quarter of 2027, so some station and tie-in work may continue.
Yes, when enough sites are open for your dates. Call (254) 629-1197 with the number of rigs, their lengths and a start date. We hold neighboring sites with a $200 refundable deposit per site, and the company can ask for one invoice.
No. Monthly sites at Inez Spring are month to month. Pipeline jobs end early, move, or run long, so you pay a month at a time and give notice when the job moves.
Pull-through sites run up to 100 feet, so many crews fit a camper and a truck, or a truck and trailer, without unhitching. Tell the office what you are bringing so we can place you on the right site.
Inez Spring Riverfront RV Park is at 10505 Interstate 20, Eastland, TX 76448, one minute off Exit 343. Abilene is about 50 minutes west and Fort Worth is about 1 hour 35 minutes east.
The big line is in. The next job is coming. In between, you need a site that rents by the month, fits the truck, and bills you for the power you use and nothing else. That is $500 or $650 a month plus your own metered electric, with a $200 refundable deposit and no lease.