The assignment sheet says Shackelford County. The hotel in Abilene says it is full through the end of the month.
And the foreman wants an address by Friday. If you just landed a job at the Vantage Frontier data center, the work is the easy part. Finding a place to park a rig for a year or more is the part nobody plans for.
This guide covers what the project is, how long it runs, where crews actually live, what each option costs against per diem, and the five questions to ask any park before the rig moves. It also covers why some crews pick the longest drive on the list, and the honest cost of doing it.
Quick answer: The Vantage Frontier data center is a 1.4 gigawatt, 10-building campus in Shackelford County near Albany TX, under construction since December 2025 for OpenAI through Oracle. Outside trackers expect most buildings to come online in 2027 and 2028. Albany has almost no RV inventory, so crews base in Abilene, Breckenridge, Baird or Eastland. Monthly RV sites at Inez Spring in Eastland, about an hour away, are $500 to $650 plus metered electric.
Working the Vantage Frontier build and need crew housing for the long haul? Inez Spring keeps monthly sites at $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month, one minute off I-20 at Exit 343, about 50 minutes from Abilene. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
The Vantage Frontier data center is a hyperscale AI campus that Vantage Data Centers is building in Shackelford County, Texas, announced at more than $25 billion and 1.4 gigawatts across 10 single-story buildings and about 3.7 million square feet. Vantage announced it in an August 2025 press release. DatacenterDynamics reported the groundbreaking in mid-December 2025: 1,200 acres at full build, hardware for OpenAI as part of the Oracle and OpenAI Stargate expansion, and more than 5,000 jobs across construction and operations.
| Item | Vantage Frontier, as published | Source |
|---|---|---|
| Location | Shackelford County; Albany, the county seat, is about 35 miles northeast of Abilene | DatacenterDynamics |
| Size | 1,200 acres, 10 buildings, about 3.7 million sq ft | Vantage, DatacenterDynamics |
| Power | 1.4 GW of IT capacity, supplied by an on-site natural gas plant built by VoltaGrid | Vantage, Cleanview |
| Customer | OpenAI, through Oracle, as part of Stargate | DatacenterDynamics |
| Groundbreaking | December 2025 | DatacenterDynamics |
| Jobs | More than 5,000 across construction and operations | DatacenterDynamics |
The power plant matters to housing more than it sounds. Cleanview's site report describes an off-grid gas microgrid of roughly 620 reciprocating engines. That is a second construction job inside the first one, with its own mechanical and electrical crews.
For an electrician, pipefitter, ironworker or commissioning tech, the number that matters is the calendar. Vantage itself said the first building goes live in the second half of 2026 and has not published a finish date. Two outside trackers have filled the gap with estimates, and they line up.
Public filings give one building a date. The state accessibility registration for Vantage DC Abilene TX3, Project Frontier, lists a 344,796 square foot building at 246 PR 1604 in Shackelford County, with work starting October 20, 2025, completion set for February 15, 2027, and Kiewit as the design firm (TDLR TABS2026024094 via Zabalist). The tenant side is hiring for construction too: Oracle posted a Principal Data Center Construction Manager role for Shackelford County or the Abilene area (ZipRecruiter, read October 28, 2026).
Newer filings stretch the calendar. Vantage Frontier Building 7 construction is registered to start November 13, 2026 and finish April 17, 2028: a 398,117 square foot data center building at 246 PR 1604 with an estimated cost of $1.15 billion (TDLR TABS2026024102, read November 9, 2026). Building 9 at the same address started April 22, 2026, with completion estimated for November 2027 (TDLR TABS2026024111 via Zabalist). Power is its own job: VoltaGrid is contracted to deploy 2.3 GW of modular gas generation across Oracle AI data centers in Texas (mgrid.org), and a TX-3 power block is registered at 175 PR 1604 in Shackelford County (TDLR TABS2026018837). VoltaGrid crews near Abilene and the building trades on Building 7 both need a monthly address through 2028; see crew RV sites near Abilene and Eastland.
Read together: 2027 is the peak year for the Vantage Frontier data center, and 2028 is the long tail for finishing trades and commissioning.
The original Stargate campus in Abilene had about 9,000 workers a day on site in early 2026, as KTXS reported that March, with construction running through the first quarter of 2027. Frontier picks up much of that workforce and keeps it in this corridor for two more years. If you are reading this in an Abilene hotel room, the question is not whether there is work in 2027. It is where you will sleep for it.
Albany TX is a small county seat with a courthouse square, a few motel rooms and no RV park built for monthly workers. Everyone on the Vantage Frontier data center job commutes. These are the realistic bases. Drive times are our estimates for a weekday morning, not measured runs, so check your own route against your assigned gate.
| Base | Drive to Frontier (est.) | Monthly RV rate | What you trade |
|---|---|---|---|
| Abilene, north and east side parks | 35 to 45 min | About $575 to $725 where published (our July 2026 check), often plus electric | Closest, but full first; waiting lists when a hiring wave lands |
| Elmdale corridor east of Abilene | About 40 min | $675 a month all-in for the site, month to month (July 2026); RV rentals are a separate product | Built for the Stargate build: about 2,300 sites, gym, fiber; a big lot with little room for a family weekend |
| Breckenridge | About 40 min | Small parks, published monthly rates are rare | Few sites, little choice when a whole crew lands |
| Baird and Clyde on I-20 | 45 to 55 min | Varies; ask for the all-in number | Quiet, but inventory is counted in single digits |
| Eastland, Inez Spring at Exit 343 | 60 to 70 min | $500 back-in, $650 pull-through, plus metered electric at 17 cents per kWh | The longest drive here, for a published rate, a riverfront park and room for the family on weekends |
Small ranch towns were never built for a 5,000-job project like the Vantage Frontier data center. A handful of motel rooms and the occasional private lot do not absorb a crew of twenty. Every time a big project lands in this part of Texas, the same pattern repeats: Abilene fills first, then the I-20 towns, then the corridor further east. Frontier is a two-year job, so the overflow reaches Eastland earlier and stays longer.
We will say the hard part out loud. An hour or more each way is a real cost. At a 6 AM gate time that is a 4:45 alarm.
The two common routes are I-20 west to Cisco and TX-6 northwest toward Albany, or I-20 west to Baird and US-283 north. Both are two-lane roads with ranch traffic and deer at dawn.
Crews that choose Eastland anyway do it for three reasons. The rate is published and does not move when the next wave of hires lands. The park is a riverfront park, not a gravel lot. And on Friday the family can drive in from Fort Worth, and the kids have a river and 24 acres instead of a parking lot.
Per diem is the daily allowance an employer pays a traveling worker for lodging and meals; many contractors pay at or near the federal rate, which for fiscal 2027, starting October 1, 2026, is $113 a night for lodging and $68 a day for meals in standard-rate areas. The figures are in the GSA fiscal 2027 rate summary; confirm your county in the GSA per diem lookup and your own contract, because employers set their own policy. Here is the math for one worker on the lodging rate.
Over a 12-month assignment that is roughly $28,000 to $30,000 that stays with the worker before electric, against a hotel that eats the whole allowance. Our per diem RV living guide for Texas runs the same ledger line by line, including where a hotel still makes sense. We publish our numbers because the parks that hide them cost crews a phone call every time a rate changes.
These are the questions that decide whether month five goes well. Ask every park on your list the same five, in this order, and write the answers down side by side.
If you have ever taken a site on a handshake and found out about the electric surcharge on the first invoice, you already know why question one comes first.
Not every worker owns a rig, and not every crew should be on RV sites. Here is how the three common crew housing setups compare for a long Vantage Frontier data center assignment.
| Setup | Monthly cost (est.) | Best for | Watch out for |
|---|---|---|---|
| Your own RV on a monthly site | $500 to $725 plus electric, depending on the park | Workers on a 6 to 24 month assignment who want to keep most of the per diem | Commute length, electric surcharges, parks that raise the rate mid-project |
| Hotel or motel room | Close to the full lodging allowance, about $3,390 at $113 a night | Short stints, supervisors who rotate home, first two weeks before the rig arrives | Availability during hiring waves, no kitchen, weekly rate changes |
| Rented RV parked on a site | Site rent plus the rental, which varies widely by unit | Workers without a rig who still want a kitchen and their own door | Rental contracts longer than the job, who pays for repairs |
For a supervisor without a rig, or a crew lead whose family comes for a long weekend, we also rent the barndominium on the property: four bedrooms, four baths, sleeps 11; see rates on the booking page. For the full Abilene picture by site type, read our guide to crew housing in Abilene, and if Elmdale is on your shortlist, our honest Elmdale RV Park versus Inez Spring comparison says where each one wins.
The first week, a crew notices the price. By week three, they notice the things nobody puts in a listing. Here is what Inez Spring has on that list:
None of that is glamorous. It is what keeps a worker from moving parks in month four, and moving parks mid-job is the most expensive thing a traveling worker does.
The Vantage Frontier data center is one of several projects that will keep traveling trades in this corridor. Three others matter for housing.
Our Stargate data center worker housing guide is the hub for all of it, with drive times and monthly rates from every base we know.
Every month in a hotel on a Vantage Frontier data center assignment costs close to the whole $3,390 allowance, and a year of that is a pickup truck you did not buy. The fix is not complicated. Pick a base you can live with for two years, lock a rate that will not move, and stop paying for a room you only sleep in.
Picture month three. The rig is level on a full-hookup site. Work clothes are drying from the laundry. On Friday your family pulls in from Fort Worth, the kids are down at the river before dinner, and the monthly invoice is the same number it was in month one.
Why it works for a Frontier crew: the rate is published, it is the same all year, and it is month to month, so it moves when your job does. What you get:
Rated 4.8 stars on 222 Google reviews as of October 2026. For a whole crew, call or text (254) 629-1197 with the crew size, rig lengths and start date, and ask which sites side by side are open.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric included on the meter.
Plan on about 60 to 70 minutes each way from Exit 343 in Eastland, an estimate, since the gate you are assigned changes the number. Most crews take I-20 west to Cisco and TX-6 northwest toward Albany, or I-20 to Baird and US-283 north. Both are two-lane roads with ranch traffic at shift change, so drive yours once at 6 AM before you commit a crew to it.
Albany TX is a small county seat with a few motel rooms and no RV park built for monthly crews, so most Vantage Frontier data center workers commute in. The realistic bases are Abilene, Breckenridge, Baird and Clyde on I-20, and the I-20 corridor at Eastland. Abilene parks are the closest but tend to fill first when a hiring wave lands, so call more than one.
In our July 2026 check, Abilene area parks that publish a monthly rate ran about $575 to $725, often plus electric. Inez Spring in Eastland is $500 a month for a back-in site and $650 for a pull-through, plus metered electric at 17 cents per kWh, a $200 refundable deposit and month-to-month terms. The rate is the same all year.
Vantage said the first building would go live in the second half of 2026. Epoch AI, which tracks the site from satellite images, estimates building 1 operational in August 2027, buildings 2 and 3 by November 2027, and building 10 in November 2028. Those are outside estimates, not a company schedule, but they point to 2027 and 2028 as the heavy years for trades who need housing.
Yes, when enough sites are open for your dates. Monthly sites are $500 for a back-in and $650 for a pull-through, plus metered electric at 17 cents per kWh, with a $200 refundable deposit per site and month-to-month terms. Call or text the office at (254) 629-1197 with crew size, rig lengths and a start date, and ask which sites side by side are open before the rigs roll.
For a long Vantage Frontier data center assignment, usually by a wide margin. The federal standard lodging rate for fiscal 2027 is $113 a night, about $3,390 a month, and Shackelford and Taylor counties have used the standard rate. A $500 site plus metered electric and about $390 a month of commuting fuel still leaves about $2,500 a month with the worker, before the electric bill is counted.
Monthly sites from $500 at Exit 343, about 50 minutes from Abilene.