
Published
Quick answer: Inez Spring Riverfront RV Park in Eastland is about 32 minutes (est.) from the Sequoia Solar build in Callahan County, where Rosendin Electric has been reported as the construction manager. Monthly sites are $500 back-in or $650 pull-through plus metered electric, month to month. The same park is about 50 minutes from Abilene, so a crew can stay put when work shifts toward the data centers.
This page is for Rosendin electricians, solar techs, foremen and the people who book their housing. It covers where Rosendin crews are working near Abilene, honest drive times and how to set up sites. For all the crew projects we house, start at our crew RV sites near Abilene page.
Rosendin crew housing near Abilene is a month to month RV site that a Rosendin worker, or a whole crew, rents for the length of a solar or data center job instead of paying nightly hotel rates. Most traveling electricians bring their own trailer and want full hookups, solid power and a short drive to the gate.
Two big jobs put Rosendin in the Abilene area: the Sequoia Solar farm southeast of town and the Stargate data center campus on the north side.
Sequoia Solar is an Enbridge project in Callahan County. At completion it is planned at about 815 MW across about 5,300 acres with about 1.8 million panels, per Enbridge (December 2024). Phase 1 was placed in service in December 2025 and Phase 2 is expected in service in 2026, per the Enbridge project page. San Angelo LIVE reported that construction is managed by Rosendin Electric.
At Stargate, ENR reported in August 2025 that Rosendin is the electrical prime contractor, with more than 1,200 Rosendin workers on site at that point and DPR Construction as general contractor. Texas Contractor reported Rosendin peaked at about 1,800 craft workers on the Abilene job, with craft workers from 37 states on its West Texas work. For the wider picture of that campus, see our Stargate worker housing guide.
About 28 miles and about 32 minutes (est.). We measured it with OpenStreetMap routing (OSRM) from the park to the Sequoia II reference point reported to the EIA, by way of I-20 and FM 880. That is a routing estimate, not a timed run. Your laydown yard or gate may sit somewhere else on a site this size, so add time.
| Job | Rosendin role | Status | Drive from Inez Spring | Source |
|---|---|---|---|---|
| Sequoia Solar Phase 2 (Sequoia II), Callahan County | Construction managed by Rosendin (reported 2024) | 415 MW; under construction, more than 50 percent; ERCOT COD Jan 2027 | About 32 min (est.) | San Angelo LIVE, EIA via Infrasure, ERCOT via Infrasure |
| Sequoia Solar Phase 1, Callahan County | Same project | In service December 2025 | About 32 min (est.) | Enbridge project page |
| Stargate Abilene (Crusoe), north Abilene | Electrical prime contractor | 8 buildings; full campus targeted for end of 2026 (reported) | About 1 hour or more (est.) | ENR, DMC Education |
| Abilene city center | n/a | n/a | About 50 min | Inez Spring |
Drive times for Abilene come from our own published figure. For the Callahan County picture beyond Sequoia, including battery and wind projects, see our Callahan County solar and battery crews page.
Likely in the next few months. Enbridge says Phase 2 is expected in service in 2026. The ERCOT queue lists a proposed commercial operation date of January 2027, and the EIA record shows the plant under construction, more than 50 percent complete. Dates on solar jobs move, so treat these as targets.
Crews that finish solar work often roll to the next big electrical job nearby. Around Abilene, that means the data centers. The Vantage Frontier campus in Shackelford County has building start dates running into January 2027, covered in our Kiewit crew housing at Frontier guide. The Microsoft campus is another, covered on our Microsoft Abilene data center crews page.
A month to month site is useful here. You are not locked into a lease when the solar job ends, and you do not have to move your rig if the next job is within an hour.
Power that holds up, a place to clean up after a hot day in the field and a site long enough for the rig. Here is what we offer.
On a day off, the Leon River runs through the park with a private kayak launch for guests who bring their own boats, and Lake Leon is about 10 minutes away.
Call the office at (254) 629-1197. Tell them the number of rigs, each rig's length and amp need, your start date and whether the company or each worker pays. The office will tell you which monthly sites are open together.
Each site is $500 back-in or $650 pull-through a month plus metered electric, with a $200 refundable deposit. We do not publish a group rate, so ask the office about anything beyond those prices. Full terms are on our monthly RV sites page.
If your company pays per diem, the FY2027 federal standard lodging rate is $113 a night, per the GSA notice in the Federal Register. Private employers set their own rules. Ask the office for a receipt with rent and electric on separate lines, and see our RV park receipt for per diem guide.
Rosendin set a goal in October 2024 to hire 700 tradeworkers in Texas, with Abilene named among its hiring locations, per Construction Dive (November 2024). Current openings are on Rosendin's own careers pages. If you are coming in from out of state for one of these jobs, book a site before you arrive so you are not hunting for one after your first shift.
San Angelo LIVE reported in November 2024 that construction of Enbridge's Sequoia Solar project in Callahan County is managed by Rosendin Electric. Enbridge's own project page does not name contractors, so confirm your scope with Rosendin.
About 28 miles and about 32 minutes (est.) from the park to the Sequoia II reference point reported to the EIA, by way of I-20 and FM 880. That is a routing estimate from OpenStreetMap data, not a timed drive, and your gate may be farther.
Enbridge says Phase 2 is expected in service in 2026. The ERCOT queue entry lists a proposed commercial operation date of January 2027, and the EIA status is under construction, more than 50 percent complete, as of the record we read.
Yes. ENR reported in August 2025 that Rosendin is the electrical prime contractor on the Crusoe data center in Abilene, with more than 1,200 Rosendin workers on site at that time. DPR Construction is the general contractor.
$500 a month for a back-in or $650 for a pull-through, plus metered electric at 17 cents per kWh. It is month to month with a $200 refundable deposit, and every RV site has full hookups, 30 and 50 amp.
Ask the office. Call (254) 629-1197 with how many rigs, their lengths, amp needs and start date, and the office will tell you which monthly sites are open together.
Sequoia II is about 32 minutes away (est.), and Abilene is about 50. A month to month site in Eastland covers the solar work now and the data center work after it, without moving the rig.
Call (254) 629-1197 to ask what is open, or read the terms on our monthly RV sites page.