
Published
Quick answer: Callahan County, around Baird and Clyde, has Sequoia II Solar (417.5 MW, signed with security posted, target January 2027) in the ERCOT queue, with Hittson Creek Solar (402.9 MW plus a 205.4 MW battery) and the Guitar battery (204.8 MW) in study behind it. Crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park in Eastland, about 30 minutes east of Baird on I-20, for $500 to $650 a month plus metered electric.
On a solar or storage crew in Callahan County? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
4.8 stars on Google from 222 reviews (October 2026). What guests say:
Baird and Clyde have few RV sites, and the Abilene parks fill with data center crews. A quiet park 30 minutes east on I-20 is a practical base. Here is what the queue shows.
Callahan County has one large signed solar project, Sequoia II Solar at 417.5 MW, and more than 800 MW of solar and storage in study behind it, per the September 2026 ERCOT report.
| Project | Size, status, target date |
|---|---|
| Sequoia II Solar | 417.5 MW, signed, security posted, target January 2027 |
| Hittson Creek Solar | 402.9 MW, in study, target December 2028 |
| Hittson Creek BESS | 205.4 MW, in study, target December 2028 |
| Guitar BESS | 204.8 MW, in study, target December 2027 |
Queue dates are developer targets, not construction dates. Projects in study may change, slip or never be built. The queue also lists Baird North Wind as approved for December 2026, but Cleanview lists the same project, BMP Wind, as operating since December 2021, so we left it out.
Sources: Parcel and Grid, Callahan County, ERCOT report September 2026, Cleanview, BMP Wind TX, read November 2, 2026.
Solar builds bring civil crews, pile drivers, racking and module installers and electricians. Battery projects add foundation and high voltage crews. That is general industry practice, not a schedule for these projects. With a January 2027 target, Sequoia II crews would be on site now or soon if the project is on schedule; ask your employer.
Inez Spring is one minute off I-20 at Exit 343. Baird is about 30 miles west on I-20, plan on about 30 minutes (est.), and Clyde about 40 minutes (est.). The Oncor 765 kV line also crosses this area; see RV sites for Oncor 765 kV line crews.
A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.
If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.
Working in the next county over? See Eastland County solar and battery projects.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.
Sequoia II Solar, 417.5 MW, is signed with security posted in the ERCOT queue and targets operation in January 2027, per the September 2026 report summarized by Parcel and Grid.
Hittson Creek Solar (402.9 MW) with a 205.4 MW battery, targeting December 2028, and the Guitar battery (204.8 MW), targeting December 2027. Both were still in study.
Inez Spring is at I-20 Exit 343 in Eastland. Baird is about 30 miles west, plan on about 30 minutes (est.).
A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.
Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.
Sequoia II Solar targets January 2027 in Callahan County, with more solar and storage behind it. Crews with an RV can stay month to month 30 minutes east of Baird at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 plus metered electric.
Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.