
Published
Quick answer: Wind turbine technicians, repower crews and crane crews work the wind farms across West Central Texas, and Eastland County has repower and uprate work in the ERCOT queue right now, including the Silver Star repower and a 7.3 MW Roadrunner Crossing uprate. Inez Spring Riverfront RV Park in Eastland is a wind turbine technician RV park with month to month sites for $500 to $650 a month plus metered electric.
Wind tech on a repower or service rotation? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
4.8 stars on Google from 222 reviews (October 2026). What guests say:
Wind work is rotation work: weeks on site, long days, early starts and a lot of driving between pads. What you want at night is a level site, full hookups, a hot shower and quiet. Here is what is happening nearby and how a monthly site fits.
The September 2026 ERCOT queue for Eastland County lists a repower of the Silver Star wind farm, approved for synchronization for December 2026, a 7.3 MW uprate at Roadrunner Crossing Wind targeting June 2027, and Anchor Wind III at 16 MW, approved. Repowers swap old blades, nacelles or controls on existing towers, which means crane crews, blade techs and electrical techs on site for months.
Sources: Parcel and Grid, Eastland County, ERCOT report September 2026, read November 2, 2026.
Inez Spring has all of that, one minute off I-20 at Exit 343. Most wind farm pads in the county are a short drive (est.), and Abilene is about 50 minutes west.
A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.
If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.
Yes. The September 2026 ERCOT queue lists a Silver Star wind repower approved for December 2026, a 7.3 MW Roadrunner Crossing uprate targeting June 2027 and Anchor Wind III at 16 MW in Eastland County.
Inez Spring Riverfront RV Park in Eastland has month to month RV sites one minute off I-20 at Exit 343, with 50 amp service, pull-throughs up to 100 feet and free Wi-Fi.
A level pull-through for a late arrival, 50 amp service, a clean shower and laundry, quiet nights and month to month terms. Inez Spring has all five, one minute off I-20 at Exit 343.
A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.
Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.
Wind repowers and uprates are queued in Eastland County. A wind turbine technician can stay month to month at a quiet, clean, family-friendly riverfront RV park with free Wi-Fi, for $500 or $650 plus metered electric.
Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.