Published
Quick answer: The September 2026 ERCOT queue lists 10 energy projects in Eastland County, about 1,357 MW in total, led by Damia Solar (306 MW), Richardson McClung Ranch Solar near Rising Star (251.9 MW plus a 205.5 MW battery) and Basketflower Solar (183 MW plus 92 MW of storage). Crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park in Eastland, inside the county, for $500 to $650 a month plus metered electric.
Building solar, storage or wind in Eastland County? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
4.8 stars on Google from 222 reviews (October 2026). What guests say:
When the work is in Eastland County, the shortest commute is a park in Eastland County. Inez Spring sits at I-20 Exit 343, so most sites in the county are a short drive away. Here is what the queue shows and how to plan housing.
Eastland County has about 1,357 MW of solar, battery and wind projects in the ERCOT interconnection queue, with two approved and eight still in study as of the September 2026 report.
| Project | Size, status, target date |
|---|---|
| Damia Solar and Storage | 306 MW solar, 153 MW storage, in study, target July 2028 |
| Richardson McClung Ranch Solar and BESS (Rising Star area) | 251.9 MW solar, 205.5 MW battery, in study, target November 2029 |
| Basketflower Solar and Storage | 183 MW solar, 92 MW storage, in study, target December 2027 |
| Star Grass Solar | 150 MW, in study, target September 2029 |
| Anchor Wind III | 16 MW, approved |
| Roadrunner Crossing BESS | Approved |
| Roadrunner Crossing Wind uprate | 7.3 MW, target June 2027 |
| Silver Star wind repower | Approved for synchronization, December 2026 |
Queue dates are developer targets, not construction dates. Projects in study may change, slip or never be built.
Sources: Parcel and Grid, Eastland County, ERCOT report September 2026, read November 2, 2026.
A utility solar build usually starts with surveyors, fencing and civil crews, then pile drivers, racking and module crews, then electricians for collection lines, inverters and the substation. Battery projects add foundation, container and high voltage crews. Wind repowers and uprates bring turbine techs and crane crews. That is general industry practice, not a schedule for any one project here. Ask your employer for the real start date and peak headcount for your scope.
Inez Spring is in Eastland, at I-20 Exit 343. Rising Star is about 30 miles south, plan on about 35 minutes (est.). Cisco, Ranger, Carbon and Gorman are 10 to 35 minutes (est.) depending on the site. Exact project sites are not public, so drive your route once before you commit.
A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.
If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.
Working further out? See RV sites for Erath County solar crews, Callahan County solar crews and Comanche County solar and battery crews.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.
Yes. The September 2026 ERCOT queue lists Damia Solar (306 MW), Richardson McClung Ranch Solar near Rising Star (251.9 MW), Basketflower Solar (183 MW) and Star Grass Solar (150 MW), plus battery storage. All four solar projects were still in study, so plans may change.
About 1,357 MW across 10 projects, two approved and eight in study, per the ERCOT report summarized by Parcel and Grid in September 2026.
No start dates are published. The queue gives target operation dates from December 2027 to November 2029, so construction would come before those dates if the projects go ahead.
Inez Spring Riverfront RV Park in Eastland has monthly RV sites one minute off I-20 at Exit 343, a short drive to most sites in the county. The office can hold a block of neighboring sites for a crew.
A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.
Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.
Eastland County has about 1,357 MW of solar, battery and wind projects in the queue, mostly still in study. When they build, crews can stay inside the county at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 a month plus metered electric.
Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.