Eastland County Solar and Battery Projects: RV Sites for Construction Crews

Eastland County Solar and Battery Projects: RV Sites for Construction Crews

Quick answer: The September 2026 ERCOT queue lists 10 energy projects in Eastland County, about 1,357 MW in total, led by Damia Solar (306 MW), Richardson McClung Ranch Solar near Rising Star (251.9 MW plus a 205.5 MW battery) and Basketflower Solar (183 MW plus 92 MW of storage). Crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park in Eastland, inside the county, for $500 to $650 a month plus metered electric.

Building solar, storage or wind in Eastland County? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.

4.8 stars on Google from 222 reviews (October 2026). What guests say:

  • "Staying here for work nearby. Nice facilities, well maintained, clean spacious laundry facilities." (Google review)
  • "Our site had full hook ups with no problem. Site was level, and the park was very clean." (RV LIFE review)
  • "Even though it's close to the main highway it is still pretty quiet." (Google review)

When the work is in Eastland County, the shortest commute is a park in Eastland County. Inez Spring sits at I-20 Exit 343, so most sites in the county are a short drive away. Here is what the queue shows and how to plan housing.

Which energy projects are planned in Eastland County?

Eastland County has about 1,357 MW of solar, battery and wind projects in the ERCOT interconnection queue, with two approved and eight still in study as of the September 2026 report.

ProjectSize, status, target date
Damia Solar and Storage306 MW solar, 153 MW storage, in study, target July 2028
Richardson McClung Ranch Solar and BESS (Rising Star area)251.9 MW solar, 205.5 MW battery, in study, target November 2029
Basketflower Solar and Storage183 MW solar, 92 MW storage, in study, target December 2027
Star Grass Solar150 MW, in study, target September 2029
Anchor Wind III16 MW, approved
Roadrunner Crossing BESSApproved
Roadrunner Crossing Wind uprate7.3 MW, target June 2027
Silver Star wind repowerApproved for synchronization, December 2026

Queue dates are developer targets, not construction dates. Projects in study may change, slip or never be built.

Who works on a solar or battery build?

A utility solar build usually starts with surveyors, fencing and civil crews, then pile drivers, racking and module crews, then electricians for collection lines, inverters and the substation. Battery projects add foundation, container and high voltage crews. Wind repowers and uprates bring turbine techs and crane crews. That is general industry practice, not a schedule for any one project here. Ask your employer for the real start date and peak headcount for your scope.

How far is the commute from Inez Spring?

Inez Spring is in Eastland, at I-20 Exit 343. Rising Star is about 30 miles south, plan on about 35 minutes (est.). Cisco, Ranger, Carbon and Gorman are 10 to 35 minutes (est.) depending on the site. Exact project sites are not public, so drive your route once before you commit.

What does a month cost at Inez Spring?

A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.

If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.

What do crews get at Inez Spring?

  • Full hookups with 30 and 50 amp service, water and sewer.
  • Pull-throughs up to 100 feet for a camper and a work truck.
  • A clean, rebuilt shower house and laundry on site.
  • Free park Wi-Fi, with many long-stay guests adding Starlink or a hotspot.
  • A quiet, tranquil riverfront park: the Leon River runs through it, with a private kayak launch and Lake Leon about 10 minutes away.
  • Family-friendly, so a spouse and kids can come along. Pets welcome, leashed, up to two per site.
  • Open year-round, one minute off I-20 at Exit 343.
  • For a supervisor without an RV, the barndominium sleeps 11. See rates on the booking page.

Ask about a monthly site for your crew

Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.

A real person at the office answers, usually the same day. Prefer to talk? Call or text (254) 629-1197.

Frequently asked questions about Eastland County solar and battery projects

Are there solar farms planned in Eastland County, Texas?

Yes. The September 2026 ERCOT queue lists Damia Solar (306 MW), Richardson McClung Ranch Solar near Rising Star (251.9 MW), Basketflower Solar (183 MW) and Star Grass Solar (150 MW), plus battery storage. All four solar projects were still in study, so plans may change.

How many MW of energy projects are in the Eastland County queue?

About 1,357 MW across 10 projects, two approved and eight in study, per the ERCOT report summarized by Parcel and Grid in September 2026.

When will construction start?

No start dates are published. The queue gives target operation dates from December 2027 to November 2029, so construction would come before those dates if the projects go ahead.

Where can solar crews stay in Eastland County?

Inez Spring Riverfront RV Park in Eastland has monthly RV sites one minute off I-20 at Exit 343, a short drive to most sites in the county. The office can hold a block of neighboring sites for a crew.

What does a monthly RV site cost at Inez Spring?

A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.

Can a whole crew park together?

Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.

The short version

Eastland County has about 1,357 MW of solar, battery and wind projects in the queue, mostly still in study. When they build, crews can stay inside the county at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 a month plus metered electric.

Call the office

Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.