Quick answer: Comanche County has 8 solar and battery projects in the September 2026 ERCOT queue, about 2,446 MW. Darkwood Solar (152 MW, target September 2027) and Lamkin Solar (101.5 MW, target November 2027) are signed with security posted, and a 614.4 MW stand-alone battery signed in March 2026. Crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park in Eastland, about 45 minutes (est.) north, for $500 to $650 a month plus metered electric.
On a solar or battery crew in Comanche County? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
4.8 stars on Google from 222 reviews (October 2026). What guests say:
Comanche County has the biggest energy pipeline near us, and few RV parks. Here is what the queue shows and how a monthly site in Eastland fits.
Comanche County has about 2,446 MW of solar and battery storage in the ERCOT queue, with four projects signed and four in study as of September 2026.
| Project | Size, status, target date |
|---|---|
| Darkwood Solar | 152 MW, signed, security posted, target September 2027 |
| Lamkin Solar | 101.5 MW, signed, security posted, target November 2027 |
| Darkwood BESS | 150.5 MW battery, signed, security posted, target July 2028 |
| Comanche BESS | 614.4 MW stand-alone battery, signed March 2026, target May 2029 |
| Dragan Solar | 411 MW, in study, target September 2027 |
| Crios BESS | 205.5 MW, in study, target March 2028 |
| Merope BESS | 402.4 MW, in study, target March 2028 |
| Dragan Storage | 408.3 MW, in study, target March 2030 |
Queue dates are developer targets, not construction dates. Projects in study may change, slip or never be built. Two Saddle Horn Station projects dropped out of the queue between the August and September reports.
Sources: Parcel and Grid, Comanche County, ERCOT report September 2026, read November 2, 2026.
Solar builds bring civil crews, pile drivers, racking and module installers and electricians; battery projects add foundation, container and high voltage crews. That is general industry practice, not a schedule for these projects. With targets in late 2027, the signed solar projects would likely mobilize in 2027 if they stay on track; ask your employer for the real date.
Inez Spring is one minute off I-20 at Exit 343 in Eastland. The city of Comanche is about 40 miles south, plan on about 45 minutes (est.). Gorman and De Leon are closer, about 25 to 35 minutes (est.). Exact project sites are not public, so drive your route once before you commit.
A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.
If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.
Darkwood Solar (152 MW) and Lamkin Solar (101.5 MW) are signed with security posted in the ERCOT queue, targeting September and November 2027, per the September 2026 report summarized by Parcel and Grid. Dragan Solar (411 MW) is in study.
About 2,446 MW across 8 projects, including a 614.4 MW stand-alone battery signed in March 2026.
Inez Spring is at I-20 Exit 343 in Eastland. Comanche is about 40 miles south, plan on about 45 minutes (est.).
A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.
Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.
Comanche County has about 2,446 MW of solar and storage in the queue, with two signed solar farms targeting late 2027. Crews with an RV can stay month to month in Eastland at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 plus metered electric.
Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.