Comanche County Solar and Battery Projects: Monthly RV Sites for Crews

Comanche County Solar and Battery Projects: Monthly RV Sites for Crews

Quick answer: Comanche County has 8 solar and battery projects in the September 2026 ERCOT queue, about 2,446 MW. Darkwood Solar (152 MW, target September 2027) and Lamkin Solar (101.5 MW, target November 2027) are signed with security posted, and a 614.4 MW stand-alone battery signed in March 2026. Crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park in Eastland, about 45 minutes (est.) north, for $500 to $650 a month plus metered electric.

On a solar or battery crew in Comanche County? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.

4.8 stars on Google from 222 reviews (October 2026). What guests say:

  • "Staying here for work nearby. Nice facilities, well maintained, clean spacious laundry facilities." (Google review)
  • "Our site had full hook ups with no problem. Site was level, and the park was very clean." (RV LIFE review)
  • "Even though it's close to the main highway it is still pretty quiet." (Google review)

Comanche County has the biggest energy pipeline near us, and few RV parks. Here is what the queue shows and how a monthly site in Eastland fits.

Which energy projects are planned in Comanche County?

Comanche County has about 2,446 MW of solar and battery storage in the ERCOT queue, with four projects signed and four in study as of September 2026.

ProjectSize, status, target date
Darkwood Solar152 MW, signed, security posted, target September 2027
Lamkin Solar101.5 MW, signed, security posted, target November 2027
Darkwood BESS150.5 MW battery, signed, security posted, target July 2028
Comanche BESS614.4 MW stand-alone battery, signed March 2026, target May 2029
Dragan Solar411 MW, in study, target September 2027
Crios BESS205.5 MW, in study, target March 2028
Merope BESS402.4 MW, in study, target March 2028
Dragan Storage408.3 MW, in study, target March 2030

Queue dates are developer targets, not construction dates. Projects in study may change, slip or never be built. Two Saddle Horn Station projects dropped out of the queue between the August and September reports.

Who works on these builds?

Solar builds bring civil crews, pile drivers, racking and module installers and electricians; battery projects add foundation, container and high voltage crews. That is general industry practice, not a schedule for these projects. With targets in late 2027, the signed solar projects would likely mobilize in 2027 if they stay on track; ask your employer for the real date.

How far is the commute from Eastland?

Inez Spring is one minute off I-20 at Exit 343 in Eastland. The city of Comanche is about 40 miles south, plan on about 45 minutes (est.). Gorman and De Leon are closer, about 25 to 35 minutes (est.). Exact project sites are not public, so drive your route once before you commit.

What does a month cost at Inez Spring?

A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.

If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.

What do crews get at Inez Spring?

  • Full hookups with 30 and 50 amp service, water and sewer.
  • Pull-throughs up to 100 feet for a camper and a work truck.
  • A clean, rebuilt shower house and laundry on site.
  • Free park Wi-Fi, with many long-stay guests adding Starlink or a hotspot.
  • A quiet, tranquil riverfront park: the Leon River runs through it, with a private kayak launch and Lake Leon about 10 minutes away.
  • Family-friendly, so a spouse and kids can come along. Pets welcome, leashed, up to two per site.
  • Open year-round, one minute off I-20 at Exit 343.
  • For a supervisor without an RV, the barndominium sleeps 11. See rates on the booking page.

Ask about a monthly site for your crew

Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.

A real person at the office answers, usually the same day. Prefer to talk? Call or text (254) 629-1197.

Frequently asked questions about Comanche County solar and battery projects

Are solar farms being built in Comanche County, Texas?

Darkwood Solar (152 MW) and Lamkin Solar (101.5 MW) are signed with security posted in the ERCOT queue, targeting September and November 2027, per the September 2026 report summarized by Parcel and Grid. Dragan Solar (411 MW) is in study.

How big is the Comanche County energy queue?

About 2,446 MW across 8 projects, including a 614.4 MW stand-alone battery signed in March 2026.

How far is Inez Spring from Comanche?

Inez Spring is at I-20 Exit 343 in Eastland. Comanche is about 40 miles south, plan on about 45 minutes (est.).

What does a monthly RV site cost at Inez Spring?

A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.

Can a whole crew park together?

Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.

The short version

Comanche County has about 2,446 MW of solar and storage in the queue, with two signed solar farms targeting late 2027. Crews with an RV can stay month to month in Eastland at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 plus metered electric.

Call the office

Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.