Quick answer: VoltaGrid is building a gas power plant of about 700 MW to supply the Vantage Frontier data center campus in Shackelford County, between Abilene and Albany. Power plant crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park in Eastland, about an hour away (est.), for $500 to $650 a month plus metered electric.
On a crew for the VoltaGrid plant at Frontier? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
4.8 stars on Google from 222 reviews (October 2026). What guests say:
Housing near the Frontier campus is tight. Vantage reported about 9,300 workers on site in October 2026, with 10,000 to 11,000 expected at peak, and the power plant crews compete for the same beds. Here is what is public and how to plan.
The VoltaGrid plant is an on-site gas power plant, reported at about 700 MW, that will supply the Vantage Frontier AI campus in Shackelford County.
| Item | Published figure |
|---|---|
| Developer | VoltaGrid |
| Serves | Vantage Data Centers Frontier campus (about 1.4 GW, 10 buildings) |
| Reported size | About 700 MW, natural gas |
| Location | Frontier campus, near TX-351 and FM 604, Shackelford County |
| Frontier workforce | About 9,300 in October 2026, 10,000 to 11,000 expected at peak |
| Plant crew count | Not published |
Sources: Industrial Info, August 6, 2026, Measured AI, March 31, 2026, The Albany News, October 15, 2026, Data Center Map, read November 2, 2026.
Gas plants need civil and foundation crews, pipefitters and welders, millwrights for the turbines or engines, electricians and instrument techs, and commissioning teams at the end. That is general industry practice, not a VoltaGrid schedule. Many of these trades travel with an RV and work long rotations, so month to month terms and a quiet place to sleep matter.
Inez Spring is one minute off I-20 at Exit 343. The Frontier campus sits north of I-20 near TX-351 and FM 604. Plan on about an hour (est.) each way: west on I-20 toward Clyde, then north. Drive it once at your shift time before you commit. Our page on RV parks for Vantage Frontier near Albany covers the campus itself.
A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.
If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.
VoltaGrid is building an on-site natural gas power plant, reported at about 700 MW, to supply the Vantage Frontier AI campus in Shackelford County, per Industrial Info in August 2026.
Data Center Map lists the campus at TX-351 and FM 604 in Shackelford County, between Abilene and Albany.
The Albany News reported about 9,300 workers in October 2026, with 10,000 to 11,000 expected at peak. A separate count for the power plant crews has not been published.
Inez Spring is at I-20 Exit 343 in Eastland. Plan on about an hour (est.) to the campus, west on I-20 toward Clyde and then north.
A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.
Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.
VoltaGrid is building about 700 MW of gas power for the Frontier campus, where about 9,300 people already work. Plant crews with an RV can stay month to month about an hour away at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 plus metered electric.
Call or text (254) 629-1197, or request a block on the crew RV sites page. Solo workers can see all the details on monthly RV sites.