Quick answer: TxDOT is rebuilding I-20 in Abilene between FM 600 and State Highway 351, just north of Abilene Christian University. The work is estimated at $125.5 million, is scheduled to start November 3, 2026 and to finish October 16, 2029. Road crews who bring an RV can rent a monthly site at Inez Spring Riverfront RV Park, about 50 minutes east on I-20, for $500 to $650 a month plus metered electric.
On a crew for the I-20 rebuild in Abilene? Inez Spring is a quiet, clean, family-friendly riverfront park one minute off I-20 at Exit 343, open year-round with free Wi-Fi. Monthly sites are $500 for a back-in or $650 for a 100-foot pull-through, electric metered at 17 cents per kWh, $200 refundable deposit, month to month. Nightly from $40 to scout first. Call or text (254) 629-1197 with crew size and dates, book a night online, or see monthly RV sites and crew RV sites between Abilene and Eastland.
4.8 stars on Google from 222 reviews (October 2026). What guests say:
A three year highway job is a long stay. Most crews want a quiet place to sleep, a clean shower and a fair monthly rate, not a motel bill that runs every night. Here is what is public about the I-20 Abilene project and how to plan housing for it.
The I-20 Abilene project is a TxDOT Abilene District rebuild of the interstate main lanes and frontage roads between FM 600 and State Highway 351, with new storm drains, retaining walls, bridges and traffic signals.
| Item | Published figure |
|---|---|
| Agency | TxDOT Abilene District |
| Limits | I-20 from FM 600 to SH 351, north of Abilene Christian University |
| Estimated cost | $125.5 million (project documents, may change) |
| Scope | Main lanes, frontage roads, storm drains, retaining walls, bridges, signals |
| Scheduled start | November 3, 2026 |
| Scheduled finish | October 16, 2029 |
| Prime contractor | Not named in the public sources we found as of November 2, 2026 |
Sources: San Antonio Express-News via Yahoo, January 16, 2026, read November 2, 2026.
A job of this size usually needs earthwork and drainage crews first, then concrete paving, bridge and retaining wall crews, then signals, striping and traffic control, with utility crews moving lines along the way. That order is general industry practice, not a TxDOT schedule. Many of these trades travel from job to job with a camper, and a three year schedule means phases that come and go. Month to month terms fit that.
Inez Spring is one minute off I-20 at Exit 343. The FM 600 to SH 351 stretch is on the north side of Abilene, about 50 miles west on the same interstate, so plan on about 50 minutes (est.) each way, more while lanes shift in the work zone. At 5 a.m. most of the drive is open road. Drive it once at your real start time before you commit. We keep drive times to the Abilene sites in the Eastland to Abilene commute table.
A back-in site is $500 a month. A pull-through up to 100 feet is $650 a month. Electric is metered at your own pedestal at 17 cents per kWh and billed on top, so the honest total is site rent plus your own meter. We do not estimate the electric, because your rig and the season decide it. The deposit is $200 per site and refundable. Terms are month to month, so a crew can stay for one phase or the whole job.
If your company pays per diem, compare the monthly total with your lodging allowance. More on that in per diem RV living in Texas.
Other work in the area: the data center campuses in Abilene (Stargate), the Microsoft campus, Dyess B-21 projects and the Oncor 765 kV line.
Send your start date, how long and how many rigs. The office replies the same day with what is open and a per-month total, electric billed on the meter.
TxDOT scheduled the rebuild of I-20 between FM 600 and State Highway 351 to start November 3, 2026, per project documents reported in January 2026. Dates in early filings can move, so check TxDOT Abilene District for the current schedule.
The scheduled finish is October 16, 2029, about three years. The work covers main lanes, frontage roads, storm drains, retaining walls, bridges and traffic signals.
We did not find a prime contractor named in public sources as of November 2, 2026. If you are on the crew, your employer will have the name and the start date for your scope.
Inez Spring is one minute off I-20 at Exit 343 in Eastland. The FM 600 to SH 351 stretch is about 50 miles west on I-20, so plan on about 50 minutes (est.) each way.
A back-in site is $500 a month and a pull-through up to 100 feet is $650 a month, plus electric metered at 17 cents per kWh. The deposit is $200 and refundable, and terms are month to month. The park is open year-round with free Wi-Fi.
Yes, when enough sites are open. Call the office with rig count, lengths and start date. We hold neighboring sites with a $200 refundable deposit per site and can set up one invoice a month for the company.
TxDOT rebuilds I-20 in north Abilene from November 3, 2026 to October 2029, an estimated $125.5 million job. Road crews with an RV can stay month to month 50 minutes east at a quiet, clean, family-friendly riverfront park with free Wi-Fi, for $500 or $650 plus metered electric.